Key Issues:
EnergyConsumption
Emissions
Biodiversity
ResourceManagement
ProductSafety&Responsibility
Environmental Expenditures
2012
Commitments
Emissions
• Perform a feasibility study on carbon capture and
sequestration for QP
• Conduct an assessment of the company’s air quality and
emissions control programs
• Sustainonshore flaring at a level belowCTO commitment
(0.3%of theproductionof sweet gas)
• FlaringReduction:
-- Install 4 Infrared (IR) ClosedCircuit Televisions (CCTVs) to
continuouslymonitor flaring from the LP andHP/MP flare
risers of Stream 1& 2 tominimize flowof purge gas
-- Perform a “flaring reduction” feasibility and cost assessment
study perMinistry of Energy and Industry requirements
• CO
2
capture: perform theplanned feasibility study as
per QP’s requirement
• Meet air emissions limits per QatarMinistry of Environment and
QPpermit requirements
• Engineer and implementmodifications to theHP steam
boilers as required to attainNOx emissions limits per theMOE
Consent toOperatepermit
ResourceManagement
• Conduct an assessment of the company’swaste
management programs
Product Safety&Responsibility
• Construct adedicatedCCTVmonitoring room for the entire
UAEGasNetwork
• Conduct one (1) contractor HSEperformance reviewmeeting
• Perform the 2012Pipeline InspectionGauge (PIG) cleaning and
inspectionProgram