Sustainability E-Report 2015 English - page 58

|
61
Water consumption
Total Water Consumption (1,000m
3
)*
ProcessWater Consumption (1,000m
3
)
Deep-Well Injection - Qatar (1,000m
3
)
Deep-Well Injection of HighlyContaminatedWastewater
Water Recycled or Reused
Non-contact CoolingWater
Total Water Consumption - Qatar
Total Water Consumption - UAE
100
50
200
100
300
150
400
200
500
600
2008
2008
2009
2009
2010
2010
2011
2011
131.8
131.5
144
151
* FromADWEA andKahramaa
of thewastewater treatment
unit, with the goal of
enhancing thequality
and filtrationof the re-
injectedwastewater. These
modifications are expected
tobe commissionedby
October 2012, and are
expected to improve
significantly thequality of
the re-injectedwater – in
particular its total suspended
solids (TSS) andoil inwater
(OIW) characteristics.
DolphinEnergy is also
conducting an engineering
study to explore the
feasibility of segregating the
offshoreproductionwater
and the onshoreprocess
water, which are currently
treated commingled in
the sour water treatment
facilities, and selecting
a suitableprocess to
remove theKineticHydrate
Inhibitor (KHI) from the
offshoreproductionwater.
If this scheme is feasible,
it should allow recycling
most of these two streams
as either irrigationwater or
desalinatedwater.
300
600
900
1200
1500
2008
2009
2010
2011
1,271.26
1,257.49
13.77
89.50
52.21
36.39
1,085.08
1,191.02
1,147.50
1,174.58
1,243.23
1,183.89
110
105
131
123
488.05
520.46
468.23
508.80
1...,48,49,50,51,52,53,54,55,56,57 59,60,61,62,63,64,65,66,67,68,...73